Improvements to the Mallard
Bay parking lot were made over a five month period in 2018 and
2019. The work involved plotting out the location of each of the
postholes needed, digging 36 postholes, placing each post in its hole,
waiting for several months for rains and water-soaked ground to dry
before straightening the posts in their holes, pouring of powdered
concrete into each hole, then applying water and waiting for the
concrete to set, then stringing nylon rope between the posts.
The effort resulted in several additional parking spaces
and a more permanent arrangement of designating parking spaces.
Thanks go to Jim Hanline, Ron Horton, Marshall
Sebra, Dale Henderson and John Fartro.