Home

Parking Lot

 

 

Improvements to the Mallard Bay parking lot were made over a five month period in 2018 and 2019.  The work involved plotting out the location of each of the postholes needed, digging 36 postholes, placing each post in its hole, waiting for several months for rains and water-soaked ground to dry before straightening the posts in their holes, pouring of powdered concrete into each hole, then applying water and waiting for the concrete to set, then stringing nylon rope between the posts.

The effort resulted in several additional parking spaces and a more permanent arrangement of designating parking spaces.  Thanks go to Jim Hanline, Ron Horton, Marshall Sebra, Dale Henderson and John Fartro.

Click on the photo of your choice for a larger view.

Photos by Cheryl Hanline and Website Staff

December 6, 2018

CIMG8059.JPG (284406 bytes)

CIMG8055.JPG (301259 bytes) CIMG8054.JPG (291137 bytes) CIMG8053.JPG (237691 bytes)

March 30, 2019

20190330_093913.jpg (372028 bytes) 20190330_094009.jpg (375384 bytes) 20190330_094033.jpg (392904 bytes) 20190330_101230.jpg (428635 bytes)
20190330_101910.jpg (351421 bytes)

April 6, 2019

20190406_091233.jpg (331651 bytes) 20190406_091324.jpg (373089 bytes) 20190406_091503.jpg (336607 bytes) 20190406_115835.jpg (380967 bytes)
20190406_115859.jpg (385301 bytes) 20190406_115925.jpg (359661 bytes) 20190406_115941.jpg (389045 bytes) 20190406_120116.jpg (406392 bytes)
image1 (1).jpeg (74559 bytes) image2 (1).jpeg (62948 bytes) image3 (1).jpeg (186174 bytes)